Total Pageviews

6 February 2014

Getting Set Up For Ambiente

Setting up ready for the opening of Ambiente tomorrow 7th-11th February 2014 at Messe Frankfurt. Didn't realise how big the building was but with 11 halls it will need to be!





The protective flooring is getting removed tonight but I'll post some pictures during the event. Looking at it now I already know what I'll do differently next time (swap the shelf and images over) I knew how I wanted it in my head (my logo decal on the top left with web address, photos underneath it, on the right the shelf so it is in line with the bottom of the images and the plinths are where I wanted them as I didn't want the taller pieces on the corner through fear that they would get knocked over.)

No comments:

Post a Comment